Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 06, 2022     45-16 Cabin door and transparencies Step 1-3 - (4 hours)       Category: Fuselage
posizione the gas strut brackets. Manufactured a bracket locating bar according to measures. Used the bracket locating bar to position the door gas strut brackets. matchdrilled the door using the brackets after aligning the strut bar to the door and canopy. Right door looks better than left door. Used the planearound brackets and filled gaps with flox to allow a more regular attach point.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.